How a Justification Posts 78 Characters and Still Follows the Rule
We read the body text of every active Department of Defense notice published in the last fourteen days, 5,800 of them. The justification, the one notice type the FAR actually tells you what to put in, runs a median of 78 characters. The content is in a half-megabyte PDF nothing can search.
At 13:49 this afternoon DLA Aviation posted a justification for a sole-source buy of grooved clamp couplings. Solicitation SPE4A726R0147, NAICS 332510, the newest justification on the board.
The notice body is empty. Zero characters.
What it carries instead is SPE4A726R0147_Redacted.pdf, 563,713 bytes.
That one is not an outlier, and the gap it opens is the widest on SAM.
Seventy-eight characters
We pulled the body text of every active DoD notice published in the fourteen days to this morning. 5,800 of them, across all six live notice types, each one re-fetched at the detail endpoint because the search index truncates the description at about 250 characters.
Then we measured how much text each one actually contains.
A solicitation runs a median of 2,854 characters. A sources sought runs 2,244.
A presolicitation 2,107, a special notice 1,841.
A justification runs 78 (chart below).

74 of the 102 DoD justifications in the window carry a body under 300 characters. 14 of them carry no body at all.
The only notice the FAR writes the contents of
Here is what makes that number strange rather than merely small.
Every other type on that chart is a voluntary document. Nothing in the FAR tells a contracting officer what a sources-sought notice has to say.
The office writes as much or as little as it likes, and on the evidence it likes about two thousand characters.
The justification is the exception. FAR 6.303-2 sets out what one has to contain, and the list is long: a demonstration that the proposed contractor's unique qualifications require the authority cited at (b)(5), a description of the effort to solicit as many sources as practicable at (b)(6), "a listing of the sources, if any, that expressed, in writing, an interest in the acquisition" at (b)(10), the actions the agency may take to overcome barriers to competition next time at (b)(11), and the contracting officer's certification that the whole thing is accurate at (b)(12).
So the one notice type with a written content standard is the one with nothing written in it.
Where the content went
Into the attachment, and the attachment satisfies the rule.
FAR 6.305 requires the agency to make the justification publicly available at the Government Point of Entry, sam.gov, within 14 days after award, 30 days for an urgency award under 6.302-2, and with the solicitation for a brand-name justification under 6.302-1(c). It has to stay up for a minimum of 30 days. It says nothing about the notice body, because the notice body is a field in a form and the regulation is about the document.
So the document goes in as a file. 101 of the 102 justifications carry at least one attachment, 97 carry a PDF, and the median PDF in the set is 572,459 bytes.
Of the 14 with an empty body, 13 have the PDF sitting right there.
Six of the attachments are not public at all. They are flagged controlled, so a login and an entitlement stand between you and a document FAR 6.305(e) already required the contracting officer to screen for proprietary data: the AMRAAM production justification at the Air Force, a DLA drawing package, the Hive Expeditionary System single-source memo, dental equipment at Yokosuka, and the DHA Traumatic Brain Injury Center of Excellence, which also happens to have the longest body in the window at 1,467 characters.
What it costs you
A saved search reads text. The justification is the document that has to name the intended source, and it is the one document on SAM whose text is an image of itself.
Which is why the rest of the census reads the way it does: of all 5,800 notices, 51 name a company as current or intended performer anywhere in the body. 0.9%.
And the type that is supposed to name one is at the bottom of the chart.
Thirty-three of the 102 are services, and they are the ones worth opening by hand.
SP4709-26-F-0033, DAI application support at DLA, body length zero. FA8612, Air Force AFLCMC/PZP ABMS, a BMC2 undefinitized contract action under NAICS 541330, body length zero, 186,906 bytes of PDF.
W52P1J19F0400JEFO, LOGCAP CES, 56 characters. N0018926CD020, a Navy collective joint training bridge, 34.
Each of those is a competitor's name, a scope, and a stated end date, posted in public, invisible to everything you have pointed at SAM.
Final Thoughts
None of this is a compliance failure. The agency posted the justification, inside the clock, in the venue the regulation names, and 6.305 is satisfied the moment the file lands.
The cost shows up one layer down, where a rule written for a filing cabinet meets a feed people now read with software.
The FAR asked for the document to be available, and it got what it asked for. What it did not ask for, and what the 78-character median is the measure of, is for the document to be findable.
So the one notice guaranteed to name a name is also the one you have to open by hand to read. Thirty-three of those in fourteen days on the services side, and nobody else is opening them either.
Thanks for reading.