Recompeted

How a Set-Aside Grew Without a New Justification

NAVSEA republished its submarine outsourcing consolidation notice on Tuesday with the scope widened from fast attack boats to the whole submarine force. The justification text is word for word what it was in December 2024, down to the typos, and the seven-day gate in FAR 7.107-5(c) puts the earliest lawful solicitation on October 12.


NAVSEA posted a consolidation notice on Sunday evening and posted it again Tuesday morning. Same solicitation number, same two contracting officers, same three misspellings in the closing paragraph.

We pulled both published versions this run and compared the description bodies. They are identical, byte for byte.

What is not identical is the notice NAVSEA published twenty-two months earlier, on December 13, 2024, under solicitation N00024-25-R-4321. That one announced a consolidation for outsourcing work from CNO availabilities on Fast Attack Submarines.

The new one, N00024-27-R-4320, announces a consolidation for outsourcing work from CNO availabilities on all Submarines.

Everything between those two phrases is a copy. The consolidated efforts are still the same three: non-discrete production support touch labor, preservation, and hull mechanical and electrical.

The benefits are still "quality, schedule, terms and conditions and, ultimately, fleet readiness and mission success." Lot 2 is still going exclusively to small business.

So the reserved lot now covers the boomers.

Two Words of Scope

The scope change did not arrive out of nowhere, and the paper trail is eight months old.

On February 10 NAVSEA posted a sources sought under N00024-26-R-4320 that laid out three things it was contemplating.

Requirement #1 was rolling admissions onto the existing FY25 vehicle. Requirement #2 was new scope for SSBNs and SSGNs, and Requirement #3 was new scope for SSNs at the two Trident Refit Facilities, SUBASE New London and Naval Base Point Loma.

Requirements #2 and #3 are what "all Submarines" means. The work locations go from the four public shipyards to the four public shipyards plus Bangor, Kings Bay, New London and Point Loma, and the hulls go from attack boats to every nuclear-powered submarine the Navy operates.

The lot structure carried over intact from the FY25 competition:

  • Lot 1, Critical. Vertical Launch System, ship control system components, torpedo tubes, bow planes, sonar dome, Large Vertical Array, shipboard hydraulics, normal fuel oil tank and systems, lube oil systems. Full and open competition.
  • Lot 2, Non-Critical. Everything that does not involve a critical system, which the Navy expects to need "fewer specialized contractor capabilities, both in terms of personnel and equipment." Small business set-aside under the 336611 size standard.

And one line from the sources sought that tells you how NAVSEA sees its own incumbents: "All interested parties, including existing IDIQ MAC awardees, are subject to competition."

If you hold one of the 26 seats, you are competing for the new scope on the same footing as a first-time offeror. The encouragement in that notice to submit a capability statement was not a courtesy.

The rest of this brief is for subscribers.

The specific solicitations, dockets, and dates to act on sit past this line.

$50 a month, or $500 a year.